Developed a undersea ploying equipment to plough and install the cable to the desired location from Mumbai to Elephata Caves.
This equipment was been used to install electricity line from Mumbai to Elephanta Caves .
Equipment was development and completed in 30 Days time which includes from concept , design, manufacturing and installation.